Actions
Bug #3011
openNew shift>The total shift cost should be displayed both outside the shift and within the shift details.
Status:
Resolved
Priority:
Normal
Assignee:
-
Start date:
03/25/2025
Due date:
% Done:
0%
Estimated time:
Actions
0%